St Andrews University
Willie Russell Laboratory
- Full electrical design, Installation
- client: University of St Andrews
- Value: £850,000
Project Details
A Study in Fast-Turnaround Electrical Installation
Works include the complete Design Supply and Install of Electrical Systems in a two story multi room laboratory and study space. A Challenging project as we were given a design period of 6 weeks and onsite fit out period of 12 weeks.
The project was completed on time and within budget. The University design team expressed delight with the finished product and shared fantastic feedback from the staff
Requirements
What We Did
Complete design, supply and installation of Electrical Systems in a two story multi room laboratory and study space. A Challenging project as we were given a design period of 6 weeks and onsite fit out period of 12 weeks.
- Incoming mains from dedicated substation and 1600A ACB
- Mains Distribution including BMS monitored metering
- Power Condition Monitoring via Schneider Ecostruxure and powertag
- Containment Systems
- General, Emergency and ‘Dark Room @ lab equipment and benching
- 52kWp Photo Voltaic array
- Fire Alarm Installation
- Security Systems
- Siemon fibre and Cat 6A Data Systems
- Lightning and Surge protection